Drywall!

New, full-size windows were installed a couple of months ago (the original full-size windows were reduced to small windows ages ago, but the new ones are more similar to the original windows,) but one was left out so that drywall could be more easily moved into the space, rather than carrying hundreds of 8, 12, and 15 foot sheets of the heavy gypsum up the stairs. Today, the empty window-frame was put to use and the materials were loaded into the (hopefully soon-to-be) Zurcher on Main Suite.

Although it’s small progress, it’s still progress (and a lot of money to get just this one thing accomplished.) We’re looking forward to the next steps of creating this wonderful vacation rental space on Main Street USA!